Increase warehouse capacity without adding headcount.

From site assessment and ROI modeling to equipment selection, systems integration, go-live, and continuous improvement—move the right automation forward through one customer-facing window.

Free consultation · We reply within 2 business daysBusiness days exclude weekends and Japanese public holidays.

  • See payback conditions before buying equipment
  • Compare AMRs first for existing warehouses
  • Measure and improve capacity after go-live

RECORDED WAREHOUSE SIMULATION

36 AMRs · recorded continuous transport

Loading recording…

Recorded shelf-to-station transport. Open the comparison to inspect fleet sizes, approaches, motion and waiting time.Open comparison

Browser simulation · not a measurement of live-site performance

Warehouse automation delivery package

Turn interest in automation into an investable decision and an executable go-live plan.

Rovnou is the evaluation, design, software, and delivery-coordination window. Contract ownership for equipment, construction, safety compliance, and maintenance is defined per project.

  1. 01
    Build the case

    Model current cost, flow, constraints, and ROI conditions

  2. 02
    Choose the method

    Compare AMRs first, then equipment, process, and layout options

  3. 03
    Go live

    Connect systems and define commissioning and acceptance KPIs

  4. 04
    Keep improving

    Use operating data and coordinated planning to improve flow

You want to automate, but the answers needed to invest are disconnected.

You want to automate the warehouse, but do not know which process to automate, what it will cost, when the investment can pay back, or who can connect the work end to end. That is the first problem to solve.

The target process is unclear

Choosing a robot first can hide mismatches with the work, routes, and peak conditions until later.

ROI assumptions are opaque

Automated time is often confused with value that can actually become capacity, avoided hiring, or cost effect.

Ownership fragments

When equipment, software, construction, and maintenance are separate, decisions and responsibility can break before go-live.

Rovnou does not sell a robot by itself or stop at a diagnostic report. The offer is a delivery package for selecting automation that can pay back, getting it live, and improving it over time.

See what payback requires before choosing a robot.

Use your own labor, operating time, investment, and operating-cost assumptions instead of a universal improvement rate. The useful question is whether the automation share and realized-effect share required for payback are credible.

Example inputs — not a quotation

Change the assumptions and see what payback would require.

Separate today’s target work, the share that can be automated, and the share that can become measurable capacity, avoided hiring, or cost effect. Results update immediately.

Make profitable automation one product across decision, delivery, and operations.

The first deliverable is not a robot quote. It is an investment decision connecting the target process, financial assumptions, equipment architecture, integration scope, and acceptance conditions.

Automation target and ROI conditions

Define investment assumptions from the current work, transport volume, peaks, labor cost, and hiring plan.

Equipment, process, and layout design

Compare AMRs, AGVs and AGFs, conveyors, AS/RS, and process changes against the same criteria.

Systems integration and operations design

Define WMS, WCS, FMS, and equipment I/O, exceptions, responsibilities, and acceptance KPIs.

Fleet coordination and continuous improvement

Reduce waiting, detours, and shared-resource conflicts as the AMR fleet grows, using Rovnou planning and operating KPIs.

What the customer buys: the capacity to meet required shipping and transport volume without adding headcount

For an existing warehouse, compare AMRs first.

AMRs are the primary candidate where staged deployment and route flexibility matter. Fixed routes or continuous flow can favor other methods. Start from payback conditions, not a predetermined machine.

Primary candidate

AMR

Evaluate staged deployment into the existing layout, flexible routes, and multiple destinations.

Fixed movement

AGV / AGF

Compare for repeatable routes, heavy loads, and fork transport where operational consistency is valuable.

High-frequency fixed flow

Conveyor / AS/RS

Compare where continuous movement or storage density justifies building and equipment work.

Add less equipment

Process redesign

Narrow automation scope when placement, replenishment, waves, or standard work should change first.

Do not stop at advice. Carry one delivery plan through go-live.

End to end does not mean Rovnou manufactures every machine. It means the customer-facing evaluation, design, and delivery path stays connected while each vendor’s contract and responsibility remain explicit.

  1. 01

    Baseline and ROI

    Review process, volume, people, peaks, routes, and systems; create automation options and payback conditions.

  2. 02

    System design

    Define equipment, quantity, layout, integration, exception handling, safety ownership, and maintenance ownership.

  3. 03

    Procure, connect, commission

    Work with selected equipment and construction companies through integration, trials, training, and acceptance.

  4. 04

    Operate and improve

    Measure completed moves, waiting, interventions, and stops; improve assignment and coordinated planning.

Combine one front door with explicit contract ownership.

Rovnou scope

  • Initial evaluation and ROI model
  • Automation and systems design
  • AMR coordinated-planning software
  • Integration specification, acceptance KPIs, and improvement design

Scope confirmed per project

  • Robot and material-handling manufacture and sale
  • Building, electrical, and equipment work
  • Regulatory review, risk assessment, and safety compliance
  • On-site maintenance, parts, and first response

Contract ownership for equipment manufacture and sale, construction, regulatory and safety compliance, and maintenance is assigned explicitly with the equipment, construction, and maintenance companies selected for each project. Rovnou does not promise unverified universal equipment supply or construction capability.

Solving aisle standoffs when your AMR fleet scales.

Five AMRs can run on basic traffic rules. At 10 or 20+ units, robots meet head-on in narrow aisles and queue at intersections—adding more robots stops increasing throughput. Rovnou computes turns, pocket yields, and passing order across the entire fleet from position, heading, and continuous tasks.

Warehouse fleet comparison

Compare recorded approaches on one warehouse floor with 12, 36 or 60 robots. Inspect motion, waiting reasons, completed deliveries and available processing time measurements.

Watch the running product demo

Planner benchmark results

Rovnou placed 6th in the League of Robot Runners 2026 Main Round Combined Track and received a Top 10 Award.

This competition result does not establish a live-warehouse improvement rate or deployment record. This measures the route-planning algorithm. ROI, equipment fit, FMS integration, and live-warehouse capacity are validated per site.

August 24 leaderboard snapshot, submission ID: 6a5fdead9348cb10ade6e361

Official LoRR results announcement

Keep existing safety controls; define the integration boundary clearly.

Integration adapts to your WMS, WCS, FMS, and equipment APIs. While Rovnou computes fleet-wide routes and passing order, low-level motion control, obstacle detection, emergency stops, and functional safety stay on the equipment side.

Rovnou

Receives tasks, positions, and headings and computes fleet-wide routes, turns, pocket yields, and passing order.

Existing systems and equipment

Handle motor control, onboard sensors, obstacle avoidance, emergency stops, PLCs, functional safety, and on-site maintenance.

Defined during integration

Specify APIs, update cadence, disconnect fallback behavior, stop authority, acceptance KPIs, and recovery procedures.

Daisuke Kuriyama

Founder / Product & Engineering

Built and led directly by the engineer behind the planner.

Leads warehouse automation design, the multi-robot path planning (MAPF) engine, and benchmark validation. Simulation metrics are kept strictly separate from live-site promises, and hardware, construction, and maintenance responsibilities are defined explicitly per project.

Questions to answer before warehouse automation

Can we start before owning any robots?

Yes. Start with current process, volume, people, peaks, and layout to define the automation target and payback conditions before selecting equipment.

Is the public ROI result a quote?

No. It is a scenario based on entered assumptions. An investment decision requires process observation, vendor quotes, construction, maintenance and integration costs, and validation of realizable effects.

Do you consider equipment other than AMRs?

AMRs are the first candidate for an existing warehouse, while AGVs and AGFs, conveyors, AS/RS, and process redesign are compared when they fit the process better.

Can Rovnou alone construct and maintain everything?

That is not universally promised. Rovnou covers evaluation, design, software, and delivery coordination. Equipment, construction, safety compliance, and local maintenance contract ownership is confirmed per project.

Does the comparison prove live-site impact?

No. It shows fleet behavior in recorded simulations. Physical performance, live-site throughput, and ROI need separate validation.

Turn “we want to automate” into investable numbers and a delivery plan.

Tell us your process, volume, and staffing, and we will work out with you the automation options and ROI assumptions that can make economic sense for your warehouse. To check payback conditions first, use the public ROI model.

Free consultation · We reply within 2 business daysBusiness days exclude weekends and Japanese public holidays.